A different metric for scheduler optimisation
Davide Libenzi
dlibenzi en maticad.it
Sab Ene 29 03:13:08 CST 2000
On Fri, 28 Jan 2000, Jamie Lokier wrote:
> Davide Libenzi wrote:
> > How many switch / sec will do a system with RQ << 1 ?
> > Stay big say 500 ( keep this number in mind ).
>
> A very good point.
100 % agree, bad conclusion !
> > Take out another cache miss into the scheduler, multiply the time a
> > cache miss takes for the number above ( 500 ), and weight it in one
> > second. What is Your improvement percent ?
>
> You're right. And a total guru for making your point in the face of
> such adversity! :-)
See above ;)
Cheers,
Davide.
-
To unsubscribe from this list: send the line "unsubscribe linux-kernel" in
the body of a message to majordomo en vger.rutgers.edu
Please read the FAQ at http://www.tux.org/lkml/
Más información sobre la lista de distribución Ayuda